| No | Standard | Authority | Description | Files |
|---|---|---|---|---|
10 |
ISO 50001 |
International Technology Quality Assurance |
Energy Management System (ISO 50001:2018 / KS A ISO 50001:2018) for: Factory 1 (The Design Devlopment and Manufacture of Value, Fittings) • Factory 3 (The Design Development and Manufacture of Power Distribution Panal boards, EMS) |
|
9 |
ISO 9001 |
HSB (Hartford Steam Boiler) |
Quality Management System (ISO 9001:2015) for: • Head Office and 1st Factory (Design and Manufacture of Valves, Manufacture of Fittings) |
|
8 |
PED Module H |
Hartford Steam Boiler Ltd. |
Quality System according to the Pressure Equipment Directive 2014/68/EU and requirements of Module H of the Directive for: Design, manufacture and final product of Pressure Accessories for Fitting & Valves |
|
7 |
ASME-NS |
ASME |
Class 1, 2 & 3 fabrication without design responsibility for supports at the above location only |
|
6 |
API-6D |
API (American Petroleum Institute) |
Ball Valves |
|
5 |
ASME-NPT |
ASME |
Class 1, 2, 3 & MC fabrication without design responsibility and furnishing metallic material at the above location only |
|
4 |
ASME-N |
ASME |
Construction of Class 1, 2 & 3 valves above location only |
|
3 |
KEPIC-MN |
Korea Electric Association |
[Please refer to the Attached] • Construction of Class 1.2.3 line valve • Class 1.2.3.MC.CS fabrication & Class 2.3 fabrication • Material organization manufacturing fitting/flange and supplying ferrous, nonferrous, welding material |